50 Years KLIK Bühnensysteme GMBH

50 Years of Success, Commitment and Innovation – We are Celebrating an Anniversary! This year, the time has come: Our company proudly looks back on 50 years of history! Since its founding in 1975, much has changed – but one thing has remained: our commitment to quality, reliability, and the satisfaction of our customers. This […]
Lifting table Haringsee

Delivery and assembly of an electro-hydraulic lifting table for a scenery storage. Dimensions: 10.0×3.0m, designed as double scissors. Lifting power 3 tons, stroke 1300mm, height 500mm, platform dimensions 10000x3000mm, lifting time 30 sec., electric motor 2,2kW, incl. railing.
Untersbergbahn, Gartenau

Delivery and assembly of an electro-hydraulic lifting table for locking a water tank on the cable car gondola. Furthermore, the execution of steel construction works and the erection of a fall protection in the area of the gondola parking position.
Suspension scaffold Maiskogelbahn, Kitzsteinhorn

Assembly of a suspended scaffold for the construction of the Maiskogelbahn at the Kitzsteinhorn.
Scaffolding with gondolas Observatory, Klagenfurt

Erection of a scaffold with 2 gondolas. The small gondola travels around the dome, the large gondola travels under the dome to carry out the necessary renovation work.
Suspended platform Praterbrücke, Vienna

Extendable working platform, 6 m length, 3 m width. The side sections can be extended on both sides to a possible total width of 5.5m. Processing of 400m rails to move the two suspended platforms from one bank side to the other by means of two reel trolleys. https://klikbuehnensysteme.at/wp-content/uploads/Video-Praterbruecke.mp4
Fall protection Porr Sirius in Aspern, Vienna

The BVH J4 Sirius construction project is a building complex consisting of a total of 3 buildings – all of which were equipped with the required rope safety systems.
Fall protection Hofburg, Vienna

Installation of 19 rope safety devices, 108 individual anchor points and 2 rail systems. The roof of the Hofburg is made of copper standing seam – for this reason the cable guardrails were installed with special copper clamps to prevent galvanic corrosion. In addition, there were many different spans (60-90cm) between the standing rafters, which […]
Roof working platform ÖBB Vienna Matzleinsdorferplatz

Construction of roof working platforms in the form of 6.0 m long gondolas on rail girders, suspended from the ceiling construction of the service hall, as well as an elevated locomotive working platform.
Roof working platform ÖBB Vienna Simmering

Construction and assembly of 4 roof working platforms, each 6.0m long, on rails – suspended from the hall roof and for a total of 2 track systems. Additionally there are crane tracks with transfer stations.